❕The formwork tracker is an AI-based tool and operates with a certain degree of imprecision. Detection is not always completely accurate. The feature is intended to give you a sense of whether formwork is being used efficiently on your construction site and is not to be understood as an exact inventory system.
The formwork tracker is located in the left navigation menu under Resources > Formwork. At the top of the page, a tab is available for each available camera. Clicking on a tab displays the formwork detected by that camera.
Formwork in the camera image
Detected wall formwork is marked directly in the camera image with colored outlines and labels.
Green – The formwork is below the defined critical standstill.
Red – The formwork has exceeded the critical standstill.
Hovering over a label with the mouse displays the tracking start and the exact date of first detection. The Label toggle (bottom right of the image) can be used to show or hide all labels.
Setting the critical standstill
At the top right of the page, you can define from when a formwork is considered critical.
Enter the desired number of days in the Critical standstill ≥ field.
Choose whether the threshold should apply in working days or calendar days.
The color markings in the camera image and the timeline below update immediately to the new value.
The timeline
At the bottom of the page, a timeline shows the project progression from start to today. Red areas indicate periods in which formwork exceeded the critical standstill.
When the critical standstill is adjusted, the timeline updates automatically.
Navigation in the timeline:
Control | Action |
▶ Play | Starts an hourly slideshow through the project progression |
› (Single arrow) | Jumps one hour forward or backward (alternatively: arrow keys on the keyboard) |
»(Double arrow) | Jumps to the same time on the next or previous day |
The formwork table
On the right side of the page, a table lists all detected formwork.
Column | Description |
Status | Green (below threshold) or red (threshold exceeded) |
ID | Non-unique ID of the formwork |
Duration | Time the formwork has been standing so far |
First detected | Date of first detection |
Hide table: The table can be shown or hidden via the table icon at the top right of the panel.
Hide individual formwork: The eye icon in a row can be used to hide formwork that is not currently relevant.
Jump to first detection: Clicking the play icon in a row jumps directly to the time of first detection of that formwork in the timeline.
Export
Using the Export button (bottom right), the formwork table can be downloaded as an Excel file — e.g. for internal meetings or documentation.